Bentec 450 at the planned dress rehearsal
During the first quarter of 2025, the Bentec 450 is undergoing a five-year inspection. The rig had to interrupt its drilling campaign in Hungary, where it has been operating since last year, to carry out this important part of its regular maintenance. The inspection itself is mainly carried out in Lusatia and partly in Bad Bentheim and Hungary. Once completed, the BT450 is expected to be recommissioned and the project will resume during April.
During the five-year inspection of the main parts of the B450 kit, the following was carried out:
- Complete Top Drive inspection, including replacement of critical parts such as main shaft, bearings. This was carried out completely by the manufacturer, Bentec,
Other equipment was inspected by MND DS in Lusatia.
- complete inspection of the flushing pumps, replacement of worn parts, NDT checks
- overhaul of Cathead (hydraulic breakaway), NDT checks, overhaul of hydraulic cylinders
- overhaul of Iron Roughneck ST-120, NDT inspections, repair of hydraulic elements, repair of kinetics
- Complete Crown Block inspection: sandblasting, NDT inspections, bearing replacement, repainting
- complete inspection of Travelling Block (hoist): sandblasting, NDT inspections, bearing replacement, coating
- Complete inspection of Dead Line Anchor: sandblasting, NDT inspection, bearing replacement, coating
- Complete inspection of Rig Floor Winches
- complete inspection of Rotary Table
Inspections included replacement and repair of the internal cooling in the VFD container.
The following measures were carried out on the rig stored in Hungary:
- Replacement of electrical cables on the Mud Tank System.
- inspections of steel structures and lifting points
- adjustment and inspection of injectors on Cummins main generators
- regular checks and inspections on other equipment and accessories of the B450
The shutdown also included fabrication and modification of the Rig floor to Trip tank scavenging drain.
- Production of individual parts was carried out in the Czech Republic
- the modification of the outlet and installation of the new parts was carried out in Hungary
Radovan Jedlička
Head of Sales Department
Other articles
From rig to management: the success story of Georg Buhrtz and MND's expansion in Germany
MND Germany GmbH has established itself as a respected drilling contractor in the German market over the past few years. Thanks to its emphasis on quality, safety and flexibility, MND Germany has managed to establish a strong position amongst its competitors and is currently successfully completing a one-year drilling campaign for one of the country's largest operators, Harbour Energy, with 40 rigs, building on the activities of the former Wintershall Dea.
We run for the Memory of the Nation - and we run great!
This year, for the first time, our company MND Drilling & Services joined the charity running challenge Run for the Memory of the Nation, organized by the non-profit organization Post Bellum. The challenge runs throughout May and aims to support the filming of remembrances of veterans, educational programmes for schools and help heroes who stood up to totalitarian regimes or are fighting for freedom today.
Second well test of Dambořice 9
The last drilling here was in the summer of 2023. While the frogs were croaking then, now, at the end of winter, there are plenty of hares and deer roaming the surrounding fields. And in the evenings, beavers are regularly seen cupitating in the adjacent Burnt Creek.