The life cycle of a borehole ends with reclamation. What does it involve?
The drilling and subsequent disposal of the probe is a fascinating process that can be likened to the life cycle from birth to death. Every well, whether exploratory or production, has its own life story. Repot is now bringing you a series that will present interesting reclamations of our specific sites one by one. But in this issue, let's talk in general terms about what such reclamation looks like, why it's done in the first place, and how much it actually costs.
The birth of the borehole
It all starts with the drilling of an exploration or production well. This then "lives" its life, which can last from a few years to several decades. The average life of an active well is between 5 and 40 years, depending on the size of the deposit.
End of life
Once the reservoir is produced, the well loses its function and becomes a financial burden for the company. It is time to dispose of it. This process involves several steps to ensure safety and minimize environmental impact.
The disposal process
- Analysis: the Geochemistry Department performs sampling and analysis for possible petroleum contamination in the soil.
- Preparation: a ground probe repair (POS) rig arrives on site.
- Equipment Removal: The original well machinery is removed.
- Cementing: The well is cemented and the cement bridge is carefully tested for tightness.
- Filling: The casing of the borehole is filled to the surface with cement mixture.
- Cutting and welding: The casing is cut 1.6 to 1.8 metres below the surface and welded with steel plates. A probe number is welded onto the last plate and the whole process is finished with a concrete cap.
Land reclamation and return
After the disposal of the borehole, the land is returned to the owners in its original state. Biological reclamation is carried out by the landowner, with the costs paid by the company over a period of three years.
Statistics and costs
The company carries out an average of 15 to 20 well abandonments and reclamations per year, costing approximately CZK 80 to 100 million.
This complex process ensures that the land is returned to its original state after mining operations are completed and the environmental impact is minimised.
Other articles
Shallow drilling campaign to start next year based on results of latest 3D seismic
For next year, our geologists have prepared a series of wells that they have identified based on the latest large 3D seismic survey. The campaign will start in the second half of the year in the Dubňany and Skoronic area. During December, however, work will begin on the last well of the season - Mikulov 3.
Artificial intelligence is already helping in MND
In recent years, Artificial Intelligence (AI) has become one of the most discussed technological phenomena. For a long time now, it has not only been discussed in the context of science fiction films or scientific research institutes. Thanks to increasingly powerful computing and the availability of data, AI technologies have seen a huge boom in recent months. AI is now making real inroads into all aspects of our lives, from work to healthcare, science, education and entertainment.
MND's plan for Ukraine: to be the country's largest foreign oil and gas producer within three years
Horizons (a subsidiary of MND Ukraine) is working on two licenses in western Ukraine, with the Tynivskaya license now ramping up and very promising. The first exploration well has exceeded expectations. Once the necessary infrastructure is completed, it will start producing gas. Horizons has seen production decline in the war years, but this trend should now reverse.