Krumvir 3 - four kilometres underground, potentially huge reserves
The deepest borehole in the Czech Republic in the last 30 years has received considerable media attention. Representatives of newspapers, TV and radio stations went to the area around Krumvír in South Moravia, where Bentec 350 is working. MND arranged an excursion for them to show their readers, viewers and listeners what it is like to work on a borehole that goes more than four kilometres underground.
The Krumvíř 3 exploration well belongs to the "High risk - high reward" category. High risk, but potentially high reward. Geologists estimate significant natural gas reserves. However, the calculated chance of success is 16 percent. So there is a high probability that it will remain "dry", but at the same time the betting is on a potentially high return if hydrocarbons are found.

"Last year we drilled 10 exploration and appraisal wells in the Czech Republic, Austria and Ukraine and this year we plan to drill 12 wells in these three countries and invest CZK 1.6 billion. We are active in production not only in Moravia, but in the long term we are continuously increasing gas production in western Ukraine in the Girska and Tynivska areas. Last year, we also entered Austria, where we are participating in the production of the Anshof field as part of our newly formed joint venture ADX," says Jana Hamršmídová, CEO of MND Energy and member of the MND Group Board of Directors. "Of course, the development of our activities, not only in conventional mining but also in the introduction of new technologies, is supported by the excellent economic results we have achieved in the last two years," adds Jana Hamršmídová.
Geological research in the Krumvír area began in the 1970s and 1980s, when geophysical surveys and so-called 2D seismic measurements were carried out, followed by more modern 3D seismic measurements in 1990, which were then supplemented by more advanced methods in the following years.
Editor-in-Chief
Other articles
Disposal of old boreholes in Berlin
In the summer of this year, MND DS started a project to dispose of several wells of the Berlin Erdgasspeicher (BES) underground gas storage facility, which is located directly in Berlin. Here, our company uses an MD 80 rig operated primarily by MND Germany employees, which enabled us to meet the customer's request for at least a partially German-speaking crew. In addition, the MD 80 has thus returned to the foreign market for which it was primarily intended after several years of operation.
Shallow drilling campaign to start next year based on results of latest 3D seismic
For next year, our geologists have prepared a series of wells that they have identified based on the latest large 3D seismic survey. The campaign will start in the second half of the year in the Dubňany and Skoronic area. During December, however, work will begin on the last well of the season - Mikulov 3.
Artificial intelligence is already helping in MND
In recent years, Artificial Intelligence (AI) has become one of the most discussed technological phenomena. For a long time now, it has not only been discussed in the context of science fiction films or scientific research institutes. Thanks to increasingly powerful computing and the availability of data, AI technologies have seen a huge boom in recent months. AI is now making real inroads into all aspects of our lives, from work to healthcare, science, education and entertainment.