Second well test of Dambořice 9
The last drilling here was in the summer of 2023. While the frogs were croaking then, now, at the end of winter, there are plenty of hares and deer roaming the surrounding fields. And in the evenings, beavers are regularly seen cupitating in the adjacent Burnt Creek.
And why is it being drilled again in the same place? Simply because the original project did not turn out positively, but provided very promising information.
The Dambořice 9 prospect is analogous to the Borkovany deposit in the deeper part of the palaeogene fill of the Nesvačil trench. Prospective resources (expected reserve size) here are 330 million cubic meters of gas.
Editor-in-Chief
Other articles
Shallow drilling campaign to start next year based on results of latest 3D seismic
For next year, our geologists have prepared a series of wells that they have identified based on the latest large 3D seismic survey. The campaign will start in the second half of the year in the Dubňany and Skoronic area. During December, however, work will begin on the last well of the season - Mikulov 3.
Artificial intelligence is already helping in MND
In recent years, Artificial Intelligence (AI) has become one of the most discussed technological phenomena. For a long time now, it has not only been discussed in the context of science fiction films or scientific research institutes. Thanks to increasingly powerful computing and the availability of data, AI technologies have seen a huge boom in recent months. AI is now making real inroads into all aspects of our lives, from work to healthcare, science, education and entertainment.
We have upgraded the Bentec 350 - increasing the lifting capacity to 418 tonnes
Our company is pleased to announce a major modification to the Bentec 350, which will increase its lifting capacity from the original 350 to 418 tonnes. This move will allow us to better respond to the growing demand for heavy rigs that has arisen not only in the Oil and Gas sector, but also in the deep geothermal drilling sector.