Second well test of Dambořice 9
The last drilling here was in the summer of 2023. While the frogs were croaking then, now, at the end of winter, there are plenty of hares and deer roaming the surrounding fields. And in the evenings, beavers are regularly seen cupitating in the adjacent Burnt Creek.
And why is it being drilled again in the same place? Simply because the original project did not turn out positively, but provided very promising information.
The Dambořice 9 prospect is analogous to the Borkovany deposit in the deeper part of the palaeogene fill of the Nesvačil trench. Prospective resources (expected reserve size) here are 330 million cubic meters of gas.
Editor-in-Chief
Other articles
Women in MND: Energy that takes many forms
Energy plans rapid growth and modernisation
The year 2025 was exceptionally successful for our division from both a financial and operational perspective. We achieved significant growth in production, revenue and profitability, and our overall results significantly exceeded the original plan. EBITDA reached CZK 1.7 billion, with our operations in Ukraine being the main driver of this outstanding performance.
He proposed. And he got a vineyard to go with it.
If you’d met Ondřej Zháněl when he was eighteen and told him he’d one day become a winemaker, he’d probably have tapped his forehead in disbelief. The son of an artistic blacksmith, growing up in Břeclav, he had a field behind his house where, at most, beetroot and potatoes were grown. Wine? That certainly didn’t feature in his plans back then.