Second well test of Dambořice 9
The last drilling here was in the summer of 2023. While the frogs were croaking then, now, at the end of winter, there are plenty of hares and deer roaming the surrounding fields. And in the evenings, beavers are regularly seen cupitating in the adjacent Burnt Creek.
And why is it being drilled again in the same place? Simply because the original project did not turn out positively, but provided very promising information.
The Dambořice 9 prospect is analogous to the Borkovany deposit in the deeper part of the palaeogene fill of the Nesvačil trench. Prospective resources (expected reserve size) here are 330 million cubic meters of gas.
Editor-in-Chief
Other articles
"For the first time, I saw what a Russian missile flyby looks like on seismic footage"
Last year Pavel Kratochvíl participated as a geologist from Hodonín in 3D seismic measurements on the Zukivska licence in the Poltava region in eastern Ukraine. In the interview he describes his experiences from the trip and the specifics of working in the area crossed by missiles.
Introduction of MND Ukraine team
MND Ukraine consists of a group of several companies. Today the main company in Ukraine is the company Horyzonty. MND Ukraine owns exploration and production rights from a total of eight licenses covering an aggregate area of almost 400 square kilometres and with a daily production of 500,000 cubic metres. MND's activities are currently managed by 59 colleagues.
Construction traffic in the middle of the swamp. Development of the Tynivská deposit continues
Excavators, bulldozers, trucks, and drilling and mining as much as possible. MND is building a new production centre and other infrastructure on the Tynivska licence that will allow it to increase production to over 700,000 cubic metres of gas per day. Let's take a look at what all is being built here.