The life cycle of a borehole ends with reclamation. What does it involve?

The drilling and subsequent disposal of the probe is a fascinating process that can be likened to the life cycle from birth to death. Every well, whether exploratory or production, has its own life story. Repot is now bringing you a series that will present interesting reclamations of our specific sites one by one. But in this issue, let's talk in general terms about what such reclamation looks like, why it's done in the first place, and how much it actually costs.

The birth of the borehole

It all starts with the drilling of an exploration or production well. This then "lives" its life, which can last from a few years to several decades. The average life of an active well is between 5 and 40 years, depending on the size of the deposit.

End of life

Once the reservoir is produced, the well loses its function and becomes a financial burden for the company. It is time to dispose of it. This process involves several steps to ensure safety and minimize environmental impact.

The disposal process

  1. Analysis: the Geochemistry Department performs sampling and analysis for possible petroleum contamination in the soil.
  2. Preparation: a ground probe repair (POS) rig arrives on site.
  3. Equipment Removal: The original well machinery is removed.
  4. Cementing: The well is cemented and the cement bridge is carefully tested for tightness.
  5. Filling: The casing of the borehole is filled to the surface with cement mixture.
  6. Cutting and welding: The casing is cut 1.6 to 1.8 metres below the surface and welded with steel plates. A probe number is welded onto the last plate and the whole process is finished with a concrete cap.

Land reclamation and return

After the disposal of the borehole, the land is returned to the owners in its original state. Biological reclamation is carried out by the landowner, with the costs paid by the company over a period of three years.

Statistics and costs

The company carries out an average of 15 to 20 well abandonments and reclamations per year, costing approximately CZK 80 to 100 million.

This complex process ensures that the land is returned to its original state after mining operations are completed and the environmental impact is minimised.

Other articles

The life cycle of a borehole ends with reclamation. What does it involve?

The drilling and subsequent disposal of the probe is a fascinating process that can be likened to the life cycle from birth to death. Every well, whether exploratory or production, has its own life story. Repot is now bringing you a series that will present interesting reclamations of our specific sites one by one. But in this issue, let's talk in general terms about what such reclamation looks like, why it's done in the first place, and how much it actually costs.

01.03.2025

The first well at Zukivska will be the most important thing this year. The reserves there are huge.

Successful development of the Tynivska licence, the Girska extension, the acquisition of Pivdeno Girska and the plan for the first well at Zhukyvska. MND has moved up a gear in Ukraine. And they are on track for further milestones. This year, the company wants to reach 150 million cubic meters of gas production in the country. Lukáš Svozil is in charge of MND's Ukrainian operations and spends much of his time on the road.

"Our success is built on two fundamental pillars that complement each other. The first pillar is a strong team in Lviv. The second is the great support from Hodonin," he says.

01.03.2025

He believed in Tynivskaya's success, now Volodya Radelytskyi has the same feeling about Zhukyvskaya

Geology is often about experience and intuition in interpreting data. 3D seismic measurements may produce hard data, but they can reveal a lot, and the human factor still plays a significant role. Volodya Radelytskyi knows the underground structures of western Ukraine very well. It was he who strongly recommended that MND buy the Tynivskaya licence. The swampy area at first sight did not have such potential.

01.03.2025
Privacy and cookie settings 🍪

The website uses cookies to provide services, personalize ads and analyze traffic.

By selecting below you agree to our privacy and cookie policy. You can change your settings at any time.

Customize