Second well test of Dambořice 9

The last drilling here was in the summer of 2023. While the frogs were croaking then, now, at the end of winter, there are plenty of hares and deer roaming the surrounding fields. And in the evenings, beavers are regularly seen cupitating in the adjacent Burnt Creek.

The original "nine" targeted the horizon at a depth of 3,100 metres and drilled essentially perpendicularly downwards. Dambořice 9A is targeting a similar depth, however, a deviation is made at 900 metres. This means that the original borehole is being sidetracked.
"The deviation is to a position that is 50 metres structurally higher, 800 metres from the original target. It's at an angle of about 30 degrees," explains Tomas Baldrián, director of the geology department at MND.
And why is it being drilled again in the same place? Simply because the original project did not turn out positively, but provided very promising information.
"The Dambořice 9 well intercepted a 250 metre complex of palaeogene sands. We tested the surface of the complex and achieved an inflow of reservoir water with a percentage of oil - up to 12 percent. This indicates that we could be somewhere close to the oil-water contact of the oil reservoir, which is in a higher structural position," added Tomas Baldrian.
The Dambořice 9 prospect is analogous to the Borkovany deposit in the deeper part of the palaeogene fill of the Nesvačil trench. Prospective resources (expected reserve size) here are 330 million cubic meters of gas.
Martin Beneš
Editor-in-Chief

Other articles

Artificial intelligence is already helping in MND

In recent years, Artificial Intelligence (AI) has become one of the most discussed technological phenomena. For a long time now, it has not only been discussed in the context of science fiction films or scientific research institutes. Thanks to increasingly powerful computing and the availability of data, AI technologies have seen a huge boom in recent months. AI is now making real inroads into all aspects of our lives, from work to healthcare, science, education and entertainment.

01.09.2024

We have upgraded the Bentec 350 - increasing the lifting capacity to 418 tonnes

Our company is pleased to announce a major modification to the Bentec 350, which will increase its lifting capacity from the original 350 to 418 tonnes. This move will allow us to better respond to the growing demand for heavy rigs that has arisen not only in the Oil and Gas sector, but also in the deep geothermal drilling sector.

01.09.2024

A hundred rescuers intervened at the reservoir in Uhřice. The exercise tested all components of the

"Section Commander to Strike Commander: we're starting to cool the probe!" comes over the radio from a fireman wearing a breathing mask. Streams of water from the fire hoses spray the production cross of the probe, from which gas escapes spontaneously to prevent ignition. Dozens of firefighters are on the scene, water tankers are running one after the other, an ambulance is on the scene and a drone is monitoring the situation.

01.09.2024
Privacy and cookie settings 🍪

The website uses cookies to provide services, personalize ads and analyze traffic.

By selecting below you agree to our privacy and cookie policy. You can change your settings at any time.

Customize